CATHODIC PROTECTION & CORROSION CONTROL
M R Vision offers Cathodic Protection design engineering services, and supervision for the installation, commissioning and monitoring of galvanic sacrificial anodes or impressed cathodic protection systems to provide corrosion mitigation and control for underground or submerged structures: buried pipelines with poor/defective/aged coatings, offshore pipelines and platforms, water tank internals, jetties, water/oil separation vessels, sheet pilings, external storage tank bottoms, piers, seawater intake systems, jetties, well casings, ship hulls.
DEBASISH MAJUMDAR
A qualified Project Management Professional (PMP®) with a Master’s degree in Civil Engineering from IIT Roorkee, having extensive experience in all aspects Structural, Naval Architectural and Architectural Engineering involving ASSESS, SELECT, Pre-FEED, FEED, Detail, and Construction Engineering (EPC) of numerous offshore platforms, onshore plant, buildings, and associated structures, as part of Operating Company, Direct Consultancy and PMC in numerous Oil and Gas projects.
Steven F. Chikos
Mr. Steven F. Chikos has over 30 years of diverse aerospace & defense experience overseeing programs critical to national security. He has worked for major contractors such as Boeing, Northrop-Grumman, BAE Systems and MDA. He has diverse program management, systems engineering, flight test, weapon system design/integration and international business development experience.
DETAILED ENGINEERING SERVICES FOR INSTALLATION OF 24" COOLING WATER SUPPLY LINE IN UTILITY AREAS OF TRAIN 1 & 2
Activity | : Detailed Engineering for Installation Of 24" Cooling Water Supply Line in Utility Areas of Train 1 & 2 |
Client | : Abu Dhabi Gas Liquefaction Company Ltd. (ADNOC-LNG) through GOGAS |
Place | Abu-Dhabi, U.A.E. |
Period | July 2018 - March 2020 |
OBJECTIVES:
R.O UNIT MODIFICATION REPLACEMENT OF UF FILTER TO SAND FILTER AT MUBARRAZ ISLAND
Activity | : R.O Unit Modification Replacement of UF Filter to Sand Filter at Mubarraz Island |
Client | : Abu Dhabi Oil Company - (ADOC) - Japan |
Place | Mubarraz Island, Abu Dhabi |
Period | August 2019 - November 2019 |
OBJECTIVES:
ENGINEERING STUDY & DESIGN FOR S3 WATER FLOWLINE
Activity | : Engineering Study & Design for S3 Water Flowline |
Client | : Hunt Oil Company through Petroweld |
Place | Kurdistan, Iraq |
Period | May 2019 - October 2019 |
HUNT OIL COMPANY (HOC) intends to install a water injection flowline from the existing Pump Station at location PF1 to the existing Water storage Tank at location S3.
DETAILED ENGINEERING FOR SARTA FLOWLINES AT KURDISTAN REGION OF IRAQ
Activity | : Detail Engineering for SARTA Flowlines at Kurdistan Region of Iraq |
Client | : Chevron through Petroweld |
Place | Kurdistan, Iraq |
Period | August 2019 - November 2019 |
Chevron intends to install early production facilities in the Sarta field to appraise and evaluate the commerciality of the Sarta field.
DETAILED ENGINEERING FOR LAYING THE FUEL GAS PIPING FROM THE OUTLET OF PECO FILTER AT WIP TO THE INLET OF PECO FILTER AT GIP
Activity | Detailed Engineering for laying the Fuel Gas piping from the outlet of PECO Filter at WIP to the inlet of PECO Filter at GIP |
Client | Bunduq Company Limited (BCL), Abu-Dhabi, UAE. |
Place | Arabian Gulf Abu-Dhabi, U.A.E. |
Period | Sept 2012 - Oct 2012. |
OBJECTIVE:
DETAILED ENGINEERING FOR FUEL GAS PIPING FOR GAS ENGINE GIP
Activity | Detailed Engineering for Fuel Gas Piping for Gas Engine GIP |
Client | Bunduq Company Limited (BCL), Abu-Dhabi, UAE. |
Place | Arabian Gulf Abu-Dhabi, U.A.E. |
Period | Feb 2012 - March 2012. |
OBJECTIVE:
The Objectives of this project is to carry out detailed Engineering for Fuel Gas Piping for Gas Engine GIP which included: