Repair of 4” GRE Pipeline Between WHP-A & CPP
Activity Engineering study of the subsea GRE pipeline for review of the current and prospective integrity of the line with a view to making recommendations for future continued functionally of the pipeline.
Client Bunduq Company Limited (BCL), Abu-Dhabi, UAE.
Place Arabian Gulf Abu-Dhabi, U.A.E.
Period March 2011 to April 2011.
FAPCO Single Point Mooring System
Period: 2011
Kencana Dana LWS Installation Engineering services
Activity Transportation, Rigging, Sea-Fastening, Lifting and Related Analysis and Pile Drivability / Stickup / Impact Studies.
Client Momentum Engineering Dubai, UAE, For PETRONAS, Malaysia.
Place Malaysia
Period April 2011 to Jun 2011.
LQP Helideck Perimeter Replacement as per CAP437
GENERAL SCOPE
• Safety wire mesh netting is specially designed and manufactured using premium quality Stainless Steel materials from the world’s most reputable steel mills.
• As per Offshore Helideck Design Guidelines, provides greater detail and supplements CAP 437 requirements.
Replacement of Sacrificial Anode for 4” Acid Gas Line (CP) & 8” measuring line (TP) in Mubarraz Island
Activity To replace consumed sacrificial anodes for4” acid gas line & 8” measuring line.
Client Abu Dhabi Oil Company Ltd (JAPAN)
Place Abu-Dhabi, U.A.E.
Period Nov 2013 –Dec 2013
Scope of Work:
BDEP for upgrade of transformer and MDB for Shell at Mina Al Fahad terminal, Oman
Activity BDEP for upgrade of transformer and Main Distribution Board (MBD) for Shell Oman Marketing at Mina Al Fahad (MAF) Terminal, Muscat, Oman
Client Shell Oman Marketing (SOM) at Mina Al Fahad (MAF) Terminal, Muscat, Oman through SMART Technical & Maintenance Services LLC (SMART)
Place Dubai, U.A.E.
Period February 2018 - March 2018
Engineering Services for Construction of Slope Stabilization Wall at Abu Dhabi Refinery
Activity | : Engineering Services for Construction of Slope Stabilization Wall at Abu Dhabi Refinery for ADNOC Onshore. |
Client | : ADNOC Refining through GOGAS |
Place | Abu-Dhabi, U.A.E. |
Period | September 2018 - October 2018 |
Abu Dhabi Refinery
Detailed Engineering Services for Replacing the Rubber Lined Carbon Steel Piping with GRP Piping for HCL Regeneration Project at Das Island
Activity Detailed Engineering Works for Replacing the Rubber Lined Carbon Steel Piping with GRP Piping for HCL Regeneration Project at Das Island
Client ADNOC Gas Liquefaction Company (ADNOC-LNG) through TARGET Engineering
Place Abu-Dhabi, U.A.E.
Period Jan– May. 2019
Residual Engineering for Conversion of 18” pipeline between WSP and ZCC from Water Injection Service to Oil Production Service
Activity Residual Engineering for Conversion of 18” Water Injection Line to Oil Transfer Line Between WSP and ZCC
Client ADNOC OFFSHORE through ADYARD
Place Abu-Dhabi, U.A.E.
Period Apr 2020 – Ongoing