FEED & DETAILED ENGINEERING

ENGINEERING STUDY & DESIGN FOR S3 WATER FLOWLINE

Oil
Activity : Engineering Study & Design for S3 Water Flowline
Client : Hunt Oil Company through Petroweld
Place Kurdistan, Iraq
Period May 2019 - October 2019

HUNT OIL COMPANY (HOC) intends to install a water injection flowline from the existing Pump Station at location PF1 to the existing Water storage Tank at location S3.

FEED & DETAILED ENGINEERING FOR THE DECK EXTENSION AT THREE LEGGED PLATFORM "CD-7" FOR INSTALLING CONDUCTOR SLOT.

Oil
Activity FEED & Detailed engineering for the deck extension at "CD-7" Platform for installing conductor slot.
Client M/s ABU DHBAI OIL COMPANY LTD (JAPAN)
Place Abu-Dhabi, U.A.E.
Period Feb'2015 - June 2015

To carry out the design of deck extension and other modifications required in the Platform structure to accommodate new well & facilities.