STRUCTURAL FEASIBILITY STUDY OF 8-LEGGED CENTRAL FACILITIES PLATFORM ("CFP") FOR ACCOMMODATING ADDITIONAL EQUIPMENT AND DECK EXTENSION IN MUBARRAZ OFFSHORE FIELD

Detailed modeling of Deck Structures with loading such as equipment, piping, etc.

Activity To carry-out structural feasibility study of 8-legged Central Facilities Platform (CFP) to accommodate new equipments.
Client ABU DHBAI OIL COMPANY LTD (JAPAN)
Place Abu-Dhabi, U.A.E.
Period Dec 2013

OBJECTIVE:

  • Detailed modeling of Deck Structures with loading such as equipment, piping, etc. Include additional loading in the global model (considering various locations for new equipments on the CFP deck in consultation with Company) such that most optimal location for the new loadings in terms platform capacity will be established.