Activity Engineering Services for Installation of the Autoclave #4 For Strata at Al Ain
Client Strata thorough Unimarine, Al Ain
Place Al Ain, U.A.E.
Period May ’2016 - Sept 2016
Process
- Prepare Process Flow Diagram indicating Heat & Material Balance
- Prepare PID for the Cooling Water System, Vacuum System based on the OEM Vendor data, Prepare the Line List, Prepare Equipment List, etc.
Mechanical/Piping
- Prepare Equipment Data Sheets for Hot & Cold-Water Tanks, Plate Heat Exchangers, Cooling water circulation pumps, Vessels etc. Piping Material specification, Equipment Layout Plan, Update the Plot Plan, Piping G.A Drawings, Piping Isometrics, Pipe Support Details, Piping Tie-in Details, Piping MTO, Design Calculations, Incorporation of Vendor Data
Civil & Structural
- Pipe Support G.A Drawings, Platform and Ladder drawings, Equipment Foundation/Installation drawings, Bill of Materials
Clients