Detailed modeling of Deck Structures with loading such as equipment, piping, etc.
Activity | To carry-out structural feasibility study of 8-legged Central Facilities Platform (CFP) to accommodate new equipments. |
Client | ABU DHBAI OIL COMPANY LTD (JAPAN) |
Place | Abu-Dhabi, U.A.E. |
Period | Dec 2013 |
OBJECTIVE:
- Detailed modeling of Deck Structures with loading such as equipment, piping, etc. Include additional loading in the global model (considering various locations for new equipments on the CFP deck in consultation with Company) such that most optimal location for the new loadings in terms platform capacity will be established.
Clients