Residual Engineering for Conversion of 18” pipeline between WSP and ZCC from Water Injection Service to Oil Production Service.

Period: 2020

Activity         Residual Engineering for Conversion of 18” Water Injection Line to Oil Transfer Line Between        WSP and ZCC

Client            ADNOC OFFSHORE through ADYARD

Place             Abu-Dhabi, U.A.E.

Period           Apr 2020 – Ongoing

 

ADNOC OFFSHORE was using its existing 14” Oil Trunk Line between WSP and ZCC to pump partially stabilized oil from Umm AI Anbar Island and West Satellite Platform. This pipeline is expected to become bottleneck by mid-2019 as oil production from Umm AI Anbar is ramped up. To improve the backpressure on crude oil transfer pumps on WSP & Umm AI Anbar Island, following mitigation measures are proposed

a)    Convert existing 12” PL-18 (WI-CI) Gas Injection pipeline to oil service

b)    Convert existing WSP-ZCC 18” Water Injection Pipeline to oil service

This project objective is to convert existing WSP-ZCC 18” Water Injection Pipeline to oil service.

 

Residual Engineering Works will encompass Process, Piping, Civil & Structural, Instrumentation & Control and HSE engineering and any other associated work required for successful implementation of the project.

Clients