Structural feasibility study of Trident VII-A for accommodating new Fire & Gas room at CFP

Activity  The structural drawings and design details of the new Fire & Gas Room.

Client     Abu Dhabi Oil Company Ltd

Place     Abu Dhabi

Period   August 2017 – October 2017

 

The analysis of the 1st Floor will be carried out to confirm the adequacy of the existing structural members to cater to the additional loadings of the F & G Room.

A three-dimensional structural model will be prepared in SACS™ suite programs. The new F & G room structural framing on the 1st floor along with existing 1st floor structural framing will be locally analyzed for the installed condition for dead, live and environmental loads.