Activity The structural drawings and design details of the new Fire & Gas Room.
Client Abu Dhabi Oil Company Ltd
Place Abu Dhabi
Period August 2017 – October 2017
The analysis of the 1st Floor will be carried out to confirm the adequacy of the existing structural members to cater to the additional loadings of the F & G Room.
A three-dimensional structural model will be prepared in SACS™ suite programs. The new F & G room structural framing on the 1st floor along with existing 1st floor structural framing will be locally analyzed for the installed condition for dead, live and environmental loads.